Get to know Safa Factory
To provide high quality pipes to local and international markets, meeting our customers' needs and gaining wide acceptance worldwide since its introduction.
Our Featured Products
At Safa Arabia Factory, we pride ourselves on providing high-quality PVC pipe solutions to leading projects throughout the Kingdom of Saudi Arabia. Here are some of our most recent highlights.
Message from the General Manager

What we do
Main Features
Non-corrosive
healthy
Low flow loss
mechanical force
Easy installation
light weight
insulator
fire resistance


- Intensive research and development to continuously improve product quality.
- Commitment to operating in accordance with ISO 9001:2015 requirements.
- Updating the infrastructure with the latest equipment according to the latest industry standards.
- Focus on training and mentoring employees to maintain their morale and knowledge.
- Conducting internal audits and improving quality control systems. We believe our growth is inevitable, and we welcome both criticism and appreciation from our customers.
- Auditing every stage of raw material production until the delivery of the final product.
Standard Specifications for Manufacturing Pipes of Safa Arabia Factory
يتم تصنيع Safa pipes لأنابيب الضغط العالي من ال UPVC ومواسير الصرف والتهوية والكهرباء من ال PCV وفقاً للمواصفات القياسية التالية

German Standards DIN 8061 and DIN 8062
American specifications ASTM D1785, D1784
American Standard ASTM D2241
American Standard ASTM D2665
British Standard BSEN 1452
British Specification BS 3506
British Specification BS 3505
Uses of Safa Pipes
Plastic Pipe Installation Instructions
في مصنع صفا العربية، نتبع عملية مبسطة وشفافة لضمان حصول كل عميل على أنابيب PVC من الدرجة الأولى وخدمة استثنائية.
CUT

CLEAN

DRAY CHECK

LUBRICATE

ASSEMBLE

JOIN

CHECK

UPVC Pipe Installation Instructions
(2) Installation Method Glue Pipes
1- Insert the tube into the head or fitting and place a circular mark to determine the overlap distance between the head and the tail.
2- The pipe tail is polished (rinsed) with a suitable coolant, especially in the case of cutting pipes at the work site.
3- Clean the head, tail and connecting parts well with a clean, dry cloth.
4- The adhesive is applied with a clean brush suitable for the diameter of the pipe in one direction on the tail of the pipe and inside the head or connecting pieces.
5- Insert the tail into the head of the pipe or fitting with the full overlap distance specified by the mark on the tail of the pipe, taking care not to move the pipe in a circular direction.
6- The line operation is tested 24 hours after the completion of the pasting process.
7- The adhesive should not be left open to prevent it from drying out.
(1) Installation method Ring head pipes Rubber (gasket):
1- Insert the (tube tail) into the head (without a rubber ring) and place a circular mark to determine the overlap distance between the head and the tail.
2- The rubber ring and the inner surface of the tube head cavity are cleaned well.
3- The beveled end (tube tail) is cleaned to remove any stuck objects or grease. The ring is then placed in the cavity using cleaning fluid.
4- Grease the chamfered part with vegetable grease and place a small amount of the same grease on the edge of the rubber ring in a circular motion only and carefully to facilitate the installation process.
5- Place the head and tail in a straight line and push them together in one motion to complete the installation process.
6- For larger sizes exceeding 280 mm, pliers are used to insert the pipe tail into the head.
Discover the latest innovations, major project achievements, and industry insights from Safa Arabia. Our news section keeps you informed.





